Definition

What reconstruction means for a landed house

Under URA guidelines, works on a landed house that exceed the criteria for additions and alterations are treated as reconstruction. Adding a storey or changing the housing form, for example from semi-detached to bungalow, is also reconstruction even where it does not exceed 50% of floor area. D&N Construction carries out reconstruction works in Singapore, working with your Qualified Persons on the design.

Scope

What we coordinate and build

  1. Selective demolition

    Removal of designated parts, sequenced with the engineer's requirements.

  2. Temporary support

    Propping and protection for retained elements as designed.

  3. New structure

    Foundations, columns, beams, slabs and walls.

  4. Tie-ins

    Connections between new work and any retained structure.

  5. Completion trades

    Coordination through to handover, according to the agreed scope.

Process

How reconstruction progresses

  1. Assess the existing house

    Your consultants review the structure, drawings and proposed changes.

  2. Design and submit

    Your Qualified Persons develop the design and make required submissions.

  3. Demolish and support

    Demolition proceeds in sequence, with retained parts protected.

  4. Rebuild and hand over

    New structure and finishes are completed and handed over.

Applications

Common reasons to reconstruct

  • Adding a storey
  • Reconfiguring an ageing home
  • Changing the housing form
  • Major works beyond A&A limits

Challenges

What we plan for

Unknown existing conditions

Findings during demolition are raised early with your engineer.

Adjoining party walls

Protection and sequencing are planned with attached neighbours in mind.

Choosing between A&A and rebuild

We share the construction view, while your Qualified Person advises on classification.

On site

From our sites

Common questions

Questions we are often asked

How do I know if my works count as reconstruction?

URA sets out criteria for A&A, including 50% limits on additional floor area, replaced external walls and structural changes. Works outside these criteria are reconstruction. Your Qualified Person will confirm how your proposal is classified.

Public sources

General summaries only. Please confirm requirements for your project with your Qualified Person or the relevant authority.

Considering a rebuild?

Tell us about your house and what you hope to change.

Request a consultation