Definition

What building a new landed house involves

New landed house construction means demolishing any existing dwelling and building a new house on the plot. URA treats works involving demolition of the entire house as new erection. D&N Construction carries out construction of new landed homes in Singapore and coordinates with your architect, professional engineer and Qualified Persons.

Scope

What we coordinate and build

  1. Site preparation

    Hoarding, protection of neighbouring properties and preparation for works.

  2. Substructure

    Foundations, ground beams, basement structures where designed, and slabs.

  3. Superstructure

    Reinforced concrete columns, beams, walls, slabs and staircases.

  4. Building trades

    Coordination of the trades needed to complete the home, according to the agreed contract scope.

  5. Handover

    Inspection, defect rectification and handover of documents.

Process

How the build progresses

  1. Brief and feasibility

    Your goals, plot and budget are reviewed with the design team.

  2. Design and approvals

    Your Qualified Persons develop plans and obtain the required approvals.

  3. Structure

    Foundations and frame are built, with inspections at key stages.

  4. Completion and handover

    Trades are completed, inspected and handed over to you.

Applications

Suitable for

  • Terrace houses
  • Semi-detached houses
  • Detached houses and bungalows

Challenges

What we plan for

Tight plots and neighbours

Excavation, deliveries and protection measures are planned around adjoining properties.

Basements and deep excavations

Construction follows the engineer's design for excavation and temporary support.

Keeping you informed

Updates at agreed stages tell you what has been done and what is next.

On site

From our sites

Common questions

Questions we are often asked

Does D&N design the house?

Design is carried out by a registered architect and professional engineer. D&N can coordinate with them and build the design.

Which approvals are required?

Requirements depend on the proposal. Your appointed Qualified Persons advise on and prepare the necessary submissions to the authorities.